Barco R 9849999 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Projektory Barco R 9849999. Barco R 9849999 User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 18
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
R 9849999
INSTALLATION MANUAL
Ceiling Mount for CLM series projector
Date 26/11/07 Rev: 00 Art. No.: R 59770182
Przeglądanie stron 0
1 2 3 4 5 6 ... 17 18

Podsumowanie treści

Strona 1 - INSTALLATION MANUAL

R 9849999 INSTALLATION MANUAL Ceiling Mount for CLM series projector Date 26/11/07 Rev: 00 Art. No.: R 59770182

Strona 2 - All rights reserved

Adjustments Following adjustment can be done in random order. Shift parallel to screen 1. Shift parallel to the screen Loosen the 2 bol

Strona 3

F vertical axis ±5°E Rotate aroundRotate around centralAxis ±3° G F

Strona 4 - R835786

3. Rotate around central Vertical axis Loosen the 4 bolts E . Rotate/adjust the projector clockwise or anti clockwise. Tighten the 4 bolts E to secu

Strona 5

Mounting the bar with Cable Cover assembly 1. Unscrew the 2 bolts J and slide out the upper part of the Bar. Pass the cable cover into the upper pa

Strona 6 - Mounting the Assembly

4. Routing the Cables a. RGBHV cable preparation: With the help of PVC tape arrange the connectors in series. Pass the Signal cables and Power cor

Strona 7

c. Pass the Power cord and the other cables (if any) one by one. d

Strona 8 - Projector preparation

6. Hang on the IQ bar and cable routed assembly. Fix with 4 M8 bolt along with washer M. M

Strona 9

There is also an option to route the cable from inside the Ceiling mount using cable ties and guiding holes on the Ceiling mount base as shown below.

Strona 10 - Adjustments

9. The adjustment procedure for the rotation around central vertical axis can also be done as explained below. Loosen the 4 M3 screws N of cable co

Strona 11

Due to constant research, the information in this manual is subject to change without notice. Produced by BARCO NV,Nov.

Strona 12

Safety guidelines WHO WARNING CAUTION PRODUCT CARE This installation manual must be performed by authorized technic

Strona 13

Description and Contents of the kit Purpose of the Kit The kit is designed for the CLM CM R10 series projectors and allows the projector to be moun

Strona 14 - 4. Routing the Cables

Remark: The ceiling mount can also be mounted using one of the 2 available bars (height adjustment) and cable cover assy. R9841260: short bar R82292

Strona 15

Mounting the Assembly Necessary Tools 1. Torx screw driver for M3 screw 2. Hexagonal driver (n° 6) 3. Ring spanner 12-13mm 4. Side spanner

Strona 16

Mounting the Assembly The fixation can be done with standard M8 bolt (not supplied)

Strona 17

Projector preparation 1. Turn the projector to its back and remove the Feet assembly. Unscrew 3 Plastic feet and remove their Allen head M10 screws.

Strona 18 - Rotate around

3. Lift and slide the projector assembly into the Ceiling mount. The projector will be located precisely into the ceiling mount base plate after the

Komentarze do niniejszej Instrukcji

Brak uwag